Danville White Water Park - hydraulic modellling and optimization

principle investigator
Ing. Vojtěch Bareš, Ph.D.
duration
2024/4 – 2024/11
funded by
Calibre Engineering
project type
Contractual r.
team members
Ing. Tomáš Picek, Ph.D.
team member
Ing. Martin Králík, Ph.D.
člen týmu (K142)
abstract

The White Mill Redevelopment Project is located North of Downtown Danville, Virgina. The proposed whitewater park is part of a larger development project that includes private as well as City redevelopment projects. Private development includes converting the White Mill Building into a mix-use development. The City’s efforts include the restoration of the former industrial canal and whitewater channel extension and connecting the project site to River Front Park.